Work break down structure | Architecture and Design homework help

 This week’s assignment is to create a work breakdown structure (WBS) for the project you selected during Unit 2. This is part of your Course Project
 Create a high-level WBS of at least three levels: • Each level should have with a minimum of five level 1 tasks, two level 2 tasks, and three (3) Level 3 tasks. • Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means. • Level Numbering: o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc.  
 Submit a Word document. • There is no need to use APA formatting for this assignment. 

"Is this qustion part of your assignmentt? We will write the assignment for you. click order now and get up to 40% Discount"